Industrial & Mining

Emet Boric Acid Plant Expansion

2nd 100,000-Ton Boric Acid Factory Project

Emet Boric Acid Plant Expansion Project

Project Overview

As part of the Emet Boric Acid Plant Expansion, Emit was responsible for the electrical, instrumentation, and automation scope for the second 100,000-ton capacity boric acid factory. This was a large-scale project requiring the implementation of a complete power and control infrastructure from the ground up.

Scope of Work & Key Deliverables

Our comprehensive scope included:

  • MV/LV Infrastructure: Installation of 6 transformer substations (two 2500 kVA and four 1000 kVA), along with all MV and LV cabling.
  • Backup Power: Installation of an 800 kVA generator system.
  • MCC Panels: Manufacturing and installation of 6 draw-out type Motor Control Center panels.
  • LV Systems: Complete installation of Low Voltage power and lighting systems.
  • Automation & Control: A 2,000 I/O Distributed Control System (DCS) was supplied and installed, including all engineering services, plus SCADA and PLC automation.
  • Instrumentation: Supply and installation of a wide array of industrial instruments, such as electromagnetic flowmeters, radar level transmitters, vibration-type level switches, and various pressure and temperature gauges.
  • Safety Systems: A complete Fire Alarm System installation.