Industrial & Mining

Emet Sulfuric Acid Plant

Miscellaneous MV & LV Electrical Works

Emet Sulfuric Acid Plant Project

Project Overview

For the Emet Sulfuric Acid Production Facility, Emit was contracted to perform the mobilization electrical works and to supply key materials and equipment. This project involved establishing the initial power infrastructure required for the plant's operations.

Scope of Work & Key Deliverables

Our work included the supply, installation, and/or commissioning of:

  • MV Switchgear: 5 units of 12 kV Medium Voltage cells.
  • MV Cabling: 2,460 meters of Medium Voltage underground cable.
  • Transformers: 2 units of 6.3/0.4 kV, 800 kVA transformers.
  • Substations: 3 reinforced concrete kiosks for transformer substations.
  • Backup Power: Installation of 2 units of 825 kVA diesel generators.
  • LV Systems: Complete installation of high-current power and lighting distribution systems.
  • Panel Manufacturing: Supply and installation of Main Distribution Panels (ADP), power, and lighting panels.