Kırka Solid Waste Conveyance System

Electrical & Automation Works

Kırka Solid Waste Conveyance System Project

Project Overview

Emit was responsible for the complete electrical and automation works for the construction of the Kırka Solid Waste Conveyance System. This project involved establishing a new, robust power and control network over a significant distance to manage the facility's waste processing operations efficiently and safely.

Scope of Work & Key Deliverables

Our turnkey solution included the supply, installation, and commissioning of the following:

  • MV Infrastructure: Supply and installation of 9,300 meters of Medium Voltage underground cable.
  • Transformer Substations: 7 reinforced concrete kiosks housing 7 transformer substations (6.3/0.4 kV, 160 kVA).
  • Switchgear: Supply and assembly of 20 Medium Voltage switchgear cells.
  • Motor Control: Supply and installation of 12 frequency converters.
  • Automation & Control: Programming and material supply for the control and monitoring of 12 frequency converters via the PentaV DCS system and RTU panels.
  • LV Systems: Complete installation of high-current power, lighting distribution systems, and lighting automation.
  • Panel Manufacturing: Supply and installation of Main Distribution Panels (ADP), power, and lighting panels.
  • Electronic Systems: A comprehensive Fire Detection and Alarm System and a Closed-Circuit Television (CCTV) system.